Skip to content

Guide

How long does it take to build a small business website?

Typical website timelines at a glance

How long a website takes depends less on how hard it is to build and more on who's doing it and how quickly decisions get made. These are typical ranges for a small business site of about five to fifteen pages, not promises: every project and provider is different.

How long a small business website takes, by who builds it
Who builds itTypical time to launchWhat sets the pace
You, on a website builderA few weekends, often spread over a month or moreYour free evenings, and how long the words and photos take
A freelance designerOften three to eight weeksTheir other projects, your content, and rounds of feedback
A web design agencyOften six to twelve weeks, longer for big sitesDiscovery meetings, approvals and scheduled review calls
Cider WebsitesA first draft in 5 to 7 business days as standard, or faster with priority or rush delivery; launch when you approveHow quickly you tell us what to change

Why the build itself is rarely the slow part

For a small site, the actual design and build work is often a matter of days. The calendar time goes on everything around it: writing the words, finding photos, waiting for a reply, booking the next call, and getting everyone who has an opinion to agree. Shorten those, and the whole project shrinks with them.

The stages of building a website, and how long each takes

Almost every website goes through the same stages, whoever builds it. The middle column is a typical range for a freelancer or a small agency; the right-hand column is how each stage works with us.

Website project stages and typical durations
StageWhat happensTypical timeWith Cider
Planning and briefDeciding the pages, the goal of the site and who it's forA few days to two weeksAbout five minutes, by form or chat
Words and photosWriting the copy, gathering photos, the logo and business detailsOne to four weeks, and the step most likely to stallSend what you have. We write the words for every page, on every launch. A logo is $149, or included in the Signature launch.
DesignThe look: layout, colors, type, the first screenOne to three weeksPart of the first draft, in 5 to 7 business days
BuildTurning the design into working pages that suit phonesOne to three weeks, often overlapping designPart of the first draft; a person checks it before you see it
Review and changesRounds of feedback and fixesOne to three weeks, depending on how fast feedback comesYou ask in plain words; each round comes back once it has passed our checks
LaunchConnecting the domain, final checks, going liveA day or twoAfter you approve and pay, on your own domain

After a domain is pointed at a new site, the change usually reaches most visitors within minutes to hours, but it can occasionally take up to a day or two to spread everywhere.

Launch day is also when search engines can start to find the site. Being listed and found takes its own time, which How to get your business on Google explains step by step.

What slows a website project down

If a website is taking months, it's almost always one of these. Most of them are fixable before the project starts.

  • Content that isn't ready. The words for each page are the most common hold-up. If you're writing them yourself, they usually take longer than you expect.
  • Photos. Waiting for a photo shoot, or hunting through phones for usable pictures, can add weeks.
  • Feedback rounds. Each round waits on you to review and on the designer to make the changes. Slow replies on either side stretch the whole project.
  • Too many decision-makers. When partners, family or a committee all need to agree, every round takes longer and changes can contradict each other.
  • Domain and DNS access. A domain registered by a former designer or employee, or a login nobody remembers, can hold up the launch for days or weeks.
  • New ideas halfway through. Adding pages or features once the design is underway often means redoing work that was already finished.
  • Third-party tools. Linking booking or ordering systems needs the right accounts and settings, and sometimes someone else's help to switch them on.

How long it takes with Cider Websites

Our process is built to remove the waiting. There are no discovery calls to book, and you see a real site before you pay anything.

  1. Tell us about your business in a five-minute brief, by form or chat, and send whatever photos, logo and menu or price list you have.
  2. Get your free first draft at the speed you choose. A person on our team checks every first draft before it reaches you.
  3. Ask for changes in plain words, like "a bigger photo of the shop" or "add Saturday hours". The Website launch includes 5 rounds of changes; the Pro and Signature launches include unlimited rounds of changes.
  4. Approve and pay the fixed launch fee only when you're happy with the site.
  5. Go live on your own domain. A person on our team approves every launch.

First-draft delivery speeds

Cider Websites first-draft delivery speeds
SpeedYour first draftCost
StandardIn 5 to 7 business daysIncluded
PriorityIn 2 to 3 business days+$199
RushOvernight, by 9:00 the next business morning+$399

Delivery targets are for the first draft, counted from when you confirm your email. If we miss a priority or rush target for a reason on our side, we refund that fee. After the first draft, the pace is mostly yours: the faster you reply, the sooner you launch. How it works walks through every step.

How to get your website built faster

  • Gather your material first. Your logo, ten or so good photos, your hours, address and phone, a list of services with prices if you share them, and a few sentences about the business.
  • Pick one decision-maker. One person collects everyone's opinions and sends a single, agreed list of changes.
  • Send feedback in one go. One clear message per round is faster than a trickle of separate notes.
  • Sort out the domain early. Find the login for your current domain, or decide to register a new one, before the site is ready to launch.
  • Start with the pages you need now. Home, services, about and contact cover most businesses. You can add more after launch. How many pages does a website need? helps you decide.
  • Link what you already use. Your existing booking, ordering and review pages can be linked from day one instead of rebuilt.
  • Pay for speed only if a date matters. If you're opening on a set day or have an event coming up, a faster first draft is worth it; otherwise the standard speed is fine.

Does a faster website mean a worse one?

Not necessarily. A small business site doesn't need months of meetings to be good: it needs clear words, good photos, a design that works on phones, and someone who checks the details. Most of the time a long project is long because of waiting, not because of extra care.

Some sites do take longer for good reasons: many locations, several brands, members' areas, or custom features that need planning and testing. For those, it's better to agree a realistic timeline up front than to rush. We price bigger projects with a custom quote, and the first draft is still free.

Whatever the size, check the finished site on a phone and a computer before launch, and make sure the things every small business website should include are there.

Questions people ask

Can a website be built in a day?

A simple one-page site can be, especially if your words and photos are ready. With us, rush delivery brings your first draft overnight, by 9:00 the next business morning, for an extra $399.

How long does a website redesign take?

About as long as a new site of the same size, since most redesigns rebuild the pages. It can be quicker if your existing words and photos can be reused.

How long do changes take after launch?

It depends on who looks after the site: on a website builder, as long as it takes you; with a designer, ask how they handle small edits and how soon. With our care plan, you send changes in the chat or by email and our team makes them, up to 4 small edits a month; larger work is quoted before we start.

Why do web design projects take so long?

Mostly waiting: on content, photos and feedback, and on meetings between rounds. The design and build work is often a small part of the calendar time.

What's the fastest way to get a professional website?

Have your details and photos ready, choose a provider that works from a short brief and shows you a draft quickly, and send each round of feedback in one message.

Read next

Want it done for you? The first draft is free

Tell us about your business and we'll do the rest. Questions first? Email hello@ciderwebsites.com.

Start your site

You pay only when you launch.